Artemis
Artemis V
A planned late-2028 lunar surface mission intended to expand sustained exploration and begin construction of NASA's Moon base infrastructure.
Launch
Late 2028
Duration
To be determined
Crew
4 astronauts

Mission record
Artemis archive entry · Planned
Mission Overview
The mission
Artemis V is planned as a crewed lunar surface mission targeted for late 2028. NASA expects the mission to continue south-polar exploration, expand surface science, introduce additional infrastructure, and begin building elements associated with a sustained Moon base. The mission is part of a planned transition from individual expeditions toward more frequent lunar operations.
Mission Details
Target Launch
Late 2028
Crew Size
4 astronauts
Primary Destination
Lunar south pole
Mission Focus
Surface exploration and infrastructure
Status
Planned
Mission by the Numbers
Mission Statistics
Mission Type
Crewed Lunar Surface Mission
Landing Site
Lunar south polar region
Launch Vehicle
space-launch-system
Crew
4 astronauts
Status
Planned
Mission Goals
Mission objectives
- 01
Continue crewed exploration of the lunar south polar region
- 02
Expand scientific investigations and sample collection
- 03
Deploy equipment supporting longer-duration surface operations
- 04
Begin construction or emplacement of early Moon base infrastructure
- 05
Test systems required for more frequent lunar surface missions
- 06
Strengthen operational experience for future missions to Mars
Engineering Reality
Challenges
Key challenges recorded for this mission.
Deliver increasingly complex surface infrastructure
Support longer and more capable lunar expeditions
Coordinate multiple commercial and government systems
Maintain a rapid mission cadence following Artemis IV
Mission Timeline
Late 2028
Planned Launch
The Artemis V crew is expected to launch aboard Orion and the Space Launch System.
During the mission
Arrival at the Moon
The crew will arrive in lunar orbit and prepare for transfer to a commercial landing system.
During the mission
Lunar Surface Landing
Crew members will descend to the lunar south polar region for exploration and infrastructure deployment.
During surface operations
Surface Infrastructure Deployment
The mission is expected to begin installing or preparing infrastructure associated with sustained Moon base operations.
Mission conclusion
Return to Earth
The crew will reunite aboard Orion and return to Earth for Pacific Ocean recovery.
Mission Hardware
Spacecraft
The launch vehicles, capsules, modules, landers, and other systems assigned to the mission.
Hardware profiles in development
Space Launch System
Launch Vehicle
Orion
Capsule
European Service Module
Service Module
Commercial Human Landing System
Lander
Lunar Surface Infrastructure
Payload
Related Stories

Apollo
The Moon Photos That Still Feel Impossible
Before social media, astronauts brought back images that changed how humanity saw itself forever.
Read Article →

Artemis
Why Artemis Will Change Lunar Exploration
NASA's return to the Moon is designed to become more sustainable, more international, and more ambitious than Apollo.
Read Article →

ISS
Life 250 Miles Above Earth
Inside the daily routine of astronauts living and working aboard the International Space Station.
Read Article →